Tavşantepe Metro Bağlantısı

 
 
 
 
 

Sabiha Gökçen Havalimanı Bağlantısı

Çamçeşme

Çamçeşme station is the 2nd station on İçmeler direction. Construction Works shall be carried out by Cut & Cover and NATM excavation methods. NATM tunnel works shall be carried out from one construction shaft. Total construction area is 4629 m².

Station Work Progress
Excavation Support :%0
RC Works :%0
Architectural Works :%0