Tavşantepe Metro Bağlantısı

 
 
 
 
 

Sabiha Gökçen Havalimanı Bağlantısı

İçmeler

İçmeler (Tuzla) is the 6th and last station of the line. Construction Works shall be carried out by Cut & Cover excavation method. The Line shall be integrated with existing Marmaray Line. Total construction area is 15.600 m².

Station Work Progress
Excavation Support :%0
RC Works :%0
Architectural Works :%0