Tavşantepe Metro Bağlantısı

 
 
 
 
 

Sabiha Gökçen Havalimanı Bağlantısı

Kavakpınar

Kavakpınar station is the 3rd station on İçmeler direction. Construction Works shall be carried out by Cut & Cover and NATM excavation methods. NATM tunnel works shall be carried out from one construction shaft. Total construction area is 3254 m².

Station Work Progress
Excavation Support :%0
RC Works :%0
Architectural Works :%0